Learn / Library / Statistics
Level forecast from changes
A series follows with , where has mean and is independent of the past. The last observed levels are and then . What is the forecast of the level steps after the last observation? Give an exact decimal.
Checking an answer needs JavaScript. The hint and the solution open without it.
Hint
Forecast each change in turn, then add them all to the last level.
Solution
- The last change is .
- The next forecast changes are , then , then .
- Adding them to the last level gives .
Answer: