Idea: A price with no formula
Monte Carlo: write the price as , simulate many futures, average the payoffs.
- Needs only draws and a payoff, no density
- A grid of points over factors: cells
- Its error depends on paths, not on factors
Formula: The estimator
The sample mean of simulated payoffs tends to the truth as n grows.
Example: A short run by hand
A call with strike . Simulated final prices: , , , , . What is the estimate?
- Payoffs: , , , ,
- Sum:
- Estimate:
Formula: Standard error
Use the sample s for σ, and report the price with about 2 standard errors either side.
Quick check: Size the error bar
Simulated payoffs have over paths. What is the standard error?
Show the answer
Answer:
, so a rough interval is each side.
Common mistake: Expecting the error to fall with n
The error falls with , not with . Doubling the paths does not halve it.
Instead Cutting error by takes times the paths: .
Idea: A probability is an average too
Average an indicator: the share of paths on which the event happened.
- Variance per path:
- Rare over paths: hit
- The error is as large as itself: plain runs starve
Quick check: Error of a probability
An event has . What is the standard error of its estimate from paths?
Show the answer
Answer:
, root , so .
Idea: Say it out loud
State the estimator, then its error: the mean payoff with standard error .
- More accuracy costs the square of the factor
- Each extra digit: times the compute
Courses / Simulation and approximation